On the display
The panel shows VSD INITIALIZATION FAILED when the VSD boards do not complete their power-up initialization. The manual groups this message with the cycling shutdown messages.
What it means
Each time power is applied, every board runs an initialization sequence in which memory is cleared, the program jumper positions are verified, and the serial communications links are set up. The message means the VSD boards failed that power-up initialization: the sequence did not finish, so the panel reports the fault.
Why it appears
- The control center and the VSD have to be energized at the same time. Pulling the fuse in the control center to take away its power creates the problem — power-up must be done by closing the main disconnect on the VSD cabinet with all fuses in place.
- A power interruption to the VSD logic board will also generate this message.
- The Eproms must be the correct version for each VSD board and must be installed correctly. They are produced as a set and cannot be interchanged between earlier and later versions.
- Serial data communications must be established. If communication between the VSD logic board and the control center does not take place during initialization, this message is generated.
What to check
- Look at how power was last applied. The control center and the VSD must be energized together, and power-up must be made by closing the main disconnect on the VSD cabinet with all fuses in place — not by pulling the control center fuse.
- Check whether the VSD logic board lost power at any point, since an interruption to it will produce the message.
- Confirm that each VSD board carries the correct Eprom version and that the Eproms are installed correctly; they are made as a set and cannot be swapped between earlier and later versions.
- Verify the serial data link: from the MOTOR screen, open the VSD DETAILS screen and read the Full Load Amps value. A zero shown for this value and the other VSD parameters points to a serial communications link problem.
Reset and restart
The manual treats this as a cycling shutdown: the chiller will automatically restart when the cycling condition clears
. After the cause is corrected, restore power the required way — close the main disconnect on the VSD cabinet with all fuses in place, so the control center and the VSD come up together.
Questions engineers ask
What does VSD INITIALIZATION FAILED mean on a YORK YMC2?
It means the VSD boards failed their power-up initialization. When power is applied, the boards clear memory, verify program jumper positions and establish serial communications links, and the fault appears if that process is not completed.
Why does VSD INITIALIZATION FAILED appear after a power event?
A power interruption to the VSD logic board generates the message, and the control center and the VSD must be energized at the same time. Power-up must be done by closing the main disconnect on the VSD cabinet with all fuses in place, not by pulling the control center fuse.
How do I verify serial communications after VSD INITIALIZATION FAILED?
Select the VSD DETAILS screen from the MOTOR screen and observe the Full Load Amps value. A zero displayed for this and the other VSD parameters indicates a serial communications link problem.
Does the chiller restart by itself after VSD INITIALIZATION FAILED?
Yes. This is a cycling shutdown, and the chiller automatically restarts when the cycling condition clears.
The same message on other models
Source
Written from the manufacturer's manuals for the YORK YMC2; every number and designation on this page is checked against them before publication. The row of the manual this message comes from:
All YORK YMC2 messages: fault codes · YORK YMC2 documentation · YORK manuals